A photographic record of Mr Taverners work in 1940.
Deeping Fen Spalding & Pinchbeck Internal Drainage Board E. G. Taverner M.S.E. Title – 1
The Delph Diversion 22 April 1940 – 2
Spearpoint 22nd April 1940 – 3
Spearpoint completed – Sept 1940 – 7
Surfleet Reservoir – 4
Excavation & Tube Laying – 5
Piling at Pode Hole – Sept 1940 – 6
Jordan’s Drain Extension – 8
Cowbit Wash Drainage 1940 – 9
Captain’s Drain – 10
Bell Row Tunnel Under New River 1940 – 11
Locks Mill Pump Cowbit Wash – 12
Twin 14″ Dia Portable Pump Driven by D G Tractor 1941 – 13
Fantail Diversion Tunnel – 1941 – 14 16
Concrete Pipes Layed Haunching in Progress – 15
Hurdletree Bank Scheme – 17 18
10 R. B. and 4 1/2 19 20 25 74
A Flooding Complaint – 21
Heading Walls – 22
Blue Gout – 23
Vernatt’s Drain Improvement 1941 – 24
Cowbit Wash – 1941 “CUB” 26
Green Lane Scheme 1942 – 27
Upstream of Beet Factory – 29
Pode Hole from Jobson’s Bridge 33 34
New Wardentree Lane Diversion – 35
Misc – 38
River Welland – 39
Crowland Common Main Drain 1943 – 40
Pennygate – 41
Cross Drain Scheme 1943 – 42
Fourth District Main Drain – 43 44
Fleethaven Outfall Improvement Scheme – 45
Flushing Creek – 46
Deeping Fen 1942 – 47
Pioneer Work – 50
Pumping Station – 51 52
Crowland Washes Scheme – 1944 – 53
Crowland Common Scheme – 1944 – 54
Town Drain – 55
Calthrop’s Dyke Scheme – 1945 – 56
Baston Fen Drain Scheme – 1945 – 57
Park Drove Outfall & South Drove – 58
Bourne and Thurlby Fen – 59 61
Piling at Pode Hall – 60
Cowbit Wash – 62
Counter Drain – 63
Thurlby Drain – 64