According to the Engineer’s Report, the breach on the River Glen occurred 1/2 a mile upstream of the railway bridge on the Bourne-Spalding line. Reply
2 Responses
According to the Engineer’s Report, the breach on the River Glen occurred 1/2 a mile upstream of the railway bridge on the Bourne-Spalding line.
Thanks, Janet.